Data center project
90 × 40 MVA and 12 × 250 MVA transformers
A current transformer order for a data center comprising ninety 40 MVA units and twelve 250 MVA units. The buyer and delivery schedule are not disclosed.

PROJECT EXPERIENCE / 1999 TO TODAY
Decades of equipment projects across utilities, energy and industry. Explore the project record, from Fort Liard to current data center orders.
29 project entries
90 × 40 MVA and 12 × 250 MVA transformers
A current transformer order for a data center comprising ninety 40 MVA units and twelve 250 MVA units. The buyer and delivery schedule are not disclosed.
3 × 60 MVA transformers for solar facilities
Three 60 MVA transformers for Capital Power’s solar facilities, supporting the electrical equipment requirements of solar generation.
230 × 250 kVA transformers
A transformer supply program for Voltagrid comprising 230 units, each rated 250 kVA.
46 three-phase pad-mount distribution transformers
Forty-six three-phase pad-mount distribution transformers for ENMAX, forming a utility distribution equipment supply project.
Excitation-system upgrades · 10-year project
An excitation-system upgrade program for BC Hydro, identified as a ten-year project beginning in the 2023 project record.
4 × 250 MVA, 240 kV GSUs and aviation lighting
Four 250 MVA, 240 kV generator step-up transformers and aviation lighting for Jenner Wind Farm, combining grid-interface equipment with obstruction lighting.
145 MVA · 138 kV transformer
A 145 MVA, 138 kV transformer for NorthRiver Midstream, supplying a large power transformer for the project.
3 DILO gas-handling carts
Three DILO gas-handling carts for Manitoba Hydro’s gas-handling equipment requirements.
2 Trojan transformer oil rejuvenation systems
Two Trojan transformer oil rejuvenation systems for Dynamo, with equipment focused on transformer oil treatment.
6 PRIMAX battery charger systems
Six PRIMAX battery charger systems for the Province of Alberta’s electrical power requirements.
Doble asset-tracking software
Doble asset-tracking software for FortisAlberta, adding a software-based asset management project to the equipment portfolio.
Drilling-rig cable for 3 onshore rigs
Drilling-rig cable for three Nabors onshore rigs, covering the cable requirements of a multi-rig program.
Fire-resistant cable for motor-operated valves
Fire-resistant cable for Syncrude’s motor-operated valve applications, with the scope specifically focused on MOV cabling.
250 MVA · 240 kV transformer
A 250 MVA, 240 kV power transformer for TransCanada Energy, extending the project portfolio in large power transformers.
40 / 50 / 60 MVA transformer
A transformer with 40/50/60 MVA ratings for the City of Medicine Hat’s electrical infrastructure requirements.
150 MVA · 144 kV transformer
A 150 MVA, 144 kV power transformer for Sinopec, forming a high-voltage equipment supply project.
IEC-rated electrical equipment
Electrical equipment with IEC ratings for Kocken Energy, aligned with the standards requirements identified for the project.
Suncor cable bus project
Cable bus equipment for Chemco’s Suncor project, focused on the project’s electrical power interconnection scope.
25 PRIMAX battery charger systems
Twenty-five PRIMAX battery charger systems for Suncor’s DC power requirements.
Fire-resistant cables
Fire-resistant cable supply for CNRL Horizon, adding a dedicated cable project to the earlier temporary-power transformer scope.
Static var compensation
Static var compensation equipment for Candor Engineering. The equipment scope addressed reactive-power compensation requirements.
Transformers and fire-resistant cable
Transformer and fire-resistant cable supply for Nexen Long Lake, bringing together power equipment and specialized cable requirements.
Temporary power transformers
Temporary power transformers for CNRL Horizon, supporting the project’s temporary electrical distribution requirements.
110 × 500 kVA dry-type transformers
A supply of 110 dry-type transformers, each rated 500 kVA, for Subcoe’s export requirements.
Fire-resistant cable for motor-operated valves
Fire-resistant cable for motor-operated valves following the Albian Sands fire. The scope focused on cable for these valve applications.
10 × 7.5 MVA transformers · 4,160 / 600 / 120–208 V
Ten 7.5 MVA transformers for Raffin Electric. The project record lists 4,160 V, 600 V and 120/208 V equipment requirements.
Three-phase pad-mount distribution contract · 10 years
A ten-year contract for three-phase pad-mount distribution transformers for EPCOR, representing a long-term utility equipment supply program.
Transformers and quick connectors
A second phase of transformer and quick-connector supply for Chevron Fort Liard, continuing the equipment scope established in Phase 1.
Transformers and quick connectors
Transformers and quick connectors for the first phase of Chevron’s Fort Liard project. The scope paired power transformation equipment with connection hardware.